Résumé
PMP® with 8+ years of experience in strategy, execution, and value creation across capital-intensive industrial and energy projects. I work at the intersection of engineering, operations, finance, and investment, helping turn complex challenges into clear decisions. My experience includes large-scale transformation and decarbonization projects, with a strong focus on structuring complexity, aligning stakeholders, and supporting execution in demanding environments. I am motivated by high-stakes problems that require rigor, judgment, and a hands-on mindset. I thrive in international and entrepreneurial settings, and I am particularly interested in strategy, transformation, industrial decarbonization, and large-scale project development. I combine practical industrial experience with a structured approach to problem solving, supported by academic training from École Polytechnique and ESADE.
Expériences professionnelles
Project strategy lead - report to cpo - post-series a (60m€) - prep. fid (+2.5b€)
GravitHy
Depuis le 02 juin 2025
► Reduced lifecycle OPEX by ~€700M by refining hydrogen needs assumptions in a self-driven initiative aligning engineering via a cross-workstream framework.
► Secured a 5.0/5.0 on GHG calculations assumptions in the 2025 EU Innovation Fund €200M+ grant application by developing a rigorous input–output excel model for raw materials and utilities of the full plant: Direct Reduction, Electrolyzers, Substation, Water Treatment Plant, and other main systems.
► De-risked FEED preparation and lender due diligence by developing the project contracting strategy, establishing clear package-level scopes (RACI-basis) and contract models (EP/EPC/EP+S/DBOOM) across the execution lifecycle to create an investor-grade EPCM delivery framework.
Project coordination & support - report to cpo - post-series a (60m€) - prep. fid (~45 empl.)
GravitHy
Depuis le 02 juin 2025
▪ Prepare presentations for the Leadership Team, Financial Advisors, and Shareholders.
▪ Coordinate project activities across workstreams (Finance, Permits, Grants & Subsidies), track actions, identify gaps, and compile the Project Monthly Report. Propose and work with workstream leaders on solutions. Set and report KPIs to Leadership Team with CPO.
▪ Manage project coordination meetings: schedule, prepare agendas, write minutes, and track actions.
▪ Support project planning, develop schedules and milestone structures. Maintain Level 1 master plan across all workstreams.
▪ Monitor risk portfolio with PMO and CFO, ensuring Risk Management compliance. Help identify risks and manage mitigation.
▪ Monitor budget with PMO/Cost Control, ensuring proper procedures and KPI tracking (Committed, Booked, Expensed).
▪ Establish document management principles across GravitHy departments. Support Lead Doc Controller with updates, archiving, and traceability.
Strategic finance & projects - report to ceo - prep. series a (~25 empl.)
GravitHy
De Juillet 2024 à Juin 2025
► Unlocked €10M Series A investment by defining, including PPT decks, and negotiating the FEL 2–3 engineering scope and schedule for the Water Treatment Plant, aligning internal engineering, investor requirements, and contractual commitments. This achievement was paramount for the signature of the Series A agreement.
► Maximized the value of a €300k in-kind Seed investment, under a critical time constraint, by negotiating scope, pricing, execution terms, and aligning the Direct Reduction team with the investor/technical supplier, converting the in-kind investment into engineering deliverables reusable in later project stages.
► Established a 1,200+ line Level 3 official master schedule, covering debt & equity fundraising tracks, all packages, permits, and grid connection.
Executive support manager - report to ceo - prep. series a (~25 empl.)
GravitHy
De Juillet 2024 à Juin 2025
▪ Prepare presentations for the Leadership Team, Financial Advisors, and potential Shareholders (Series A).
▪ Coordinate project activities across workstreams: Finance, Permits, Grants & Subsidies. Track actions, identify gaps, and advance the Series A capital raising mission.
▪ Project Control Management: Oversee project activities, responsible for the project Master Schedule, Scope & Configuration Management Matrix, and Risk Management.
▪ Budget and Financing: work with Finance on budget alignment and technical support for Grants and Subsidies applications.
▪ Innovation & Compliance: Foster innovation, improve internal processes: I designed and launched GravitHy Talks. A company-wide alignment initiative where each area leader presents a topic weekly to teach and align knowledge across the company. One season, 8 episodes. Second season ongoing.
Project development lead - report to coo - post-seed round - start of prep. series a (~12 empl.)
GravitHy
De Juin 2023 à Juillet 2024
► As 4th hire, managed the interface with FEL 1 engineering firm and produced public consultation PPT decks for local communities’ events during the earliest company stage.
Operations coordinator - report to coo - post-seed round - start of prep. series a (~12 empl.)
GravitHy
De Juin 2023 à Juillet 2024
▪ I joined GravitHy as the fourth employee working hand-in-hand since the beginning with the CEO, COO, and CFO.
▪ Developed technical dossier for Innovation Fund 2023, including GHG emissions analysis, innovation strategy, and project schedule.
▪ Conducted research, analysis, and presentation on industrial risks and pollution for public consultation.
▪ Created and designed slide decks for Series A funding pitch presentations.
▪ Coordinated cross-functional project activities during FEL 1 Engineering Stage aligned with the start of preparation of permits application.
Consultant energy and environment - decarbonization strategy
Leyton
De Novembre 2022 à Juin 2023
- Creation of Leyton's offer on decarbonization strategy: development of partnerships for the clients’ corporate carbon footprint assessment (GHG Protocol, Bilan Carbone, ISO 14067), definition of decarbonization pathways validated by SBTi, decarbonization action plan, investment analysis, carbon tax savings, carbon market quotas (ETS), and project financing.
- Construction of new value propositions for our clients in collaboration with marketing for energy efficiency certificate products, PV self-consumption, and state aids and subsidies for decarbonization.
- Constant monitoring of energy and environmental regulatory news, the energy market, EU directives and transposition into French law.
- Identification of development of new business models for our customers for energy and costs savings with innovative offers.
- Carrying out consulting missions with customers to validate the feasibility of new offers/solutions.
Energy and environment consultant – decarbonization strategy
Leyton
De Novembre 2022 à Juin 2023
► Expanded Leyton’s decarbonization offering by designing a cross-sell advisory proposition covering GHG accounting, SBTi trajectories, investment analysis, and ETS carbon quotas optimization, complementing existing consulting services to obtain grants, subsidies, CEE, and carbon-credit trading.
Decarbonisation of industry - business booster energy
Artelia
De Mars 2022 à Septembre 2022
► Defined Artelia’s strategic positioning in industrial decarbonization by developing a roadmap aligning engineering capabilities with key technologies (energy efficiency, renewables, hydrogen, carbon capture) and conducting competitor and client analyses to identify growth opportunities.
Industrial planning analyst
Tenaris
De Avril 2020 à Juillet 2020
► Improved the coating line performance by 5% and reduced changeover times by 4% through bottleneck analysis and SMED process optimization.
Project engineer
Tenaris
De Septembre 2017 à Avril 2020
► Increased coupling-shop productivity by 20%, raising total plant capacity to 2.6M couplings/year, by delivering a €1.6M CAPEX project to install 8 used and new lathes from supplier sourcing and U.S. broker visits through logistics, commissioning, and handover to operations & maintenance department.
► Improved phosphatizing-process reliability and supported throughput in the 2.2M+ couplings/year factory by leading the end-to-end replacement of the critical crane, from design through erection, directing 58+ technical staff over 21days and 3 shifts, and later commissioning and handover to Operations department.
Technical project leader - global trainee graduate program
Tenaris
De Août 2016 à Août 2017
► Industrialized a new internal HDPE coating process for Oil & Gas tubing, leading the process development, the mold design, the installation of a €175k diameter reduction machine, then successfully launched production through start-up and trained 15 plant operators (Wrote work instructions and operations procedures).
Intern at coordination of operations and maintenance
Oleoducto Bicentenario de Colombia SAS
De Juin 2013 à Décembre 2013
► Supported the start-up of an oil pipeline system for Ecopetrol by contributing to valve commissioning and filling operations, coordinating logistics, and ensuring adherence to operational procedures during critical execution phases.
Parcours officiels
Langues
Espagnol - Bilingue
Français - Bilingue
Anglais - Bilingue
Italien - Notions
Allemand - Notions